Name of the project: Architectural and Engineering Services for Master Plan of Date Palm Island Project
Consultant : Dynamic Engineering Consultants Co.,Ltd.
Location: Dubai, UAE
Name of owner: Dubai Port Authority, UNITED ARAB EMIRATES.
Financing agency/institution: Dubai Port Authority
Value of project1: -
Value of firms, or JV, or US$ 50,000 (Baht 45/US$)
Consortium’s contract1:
Original and actual dates August 2000- January 2001
Of commencement & completion:
Firms participation2: Member of Consortium
Name of partners 2: Inter Design Co., Ltd.
Brief description of project:
Architectural and Engineering Services for Master Plan of Date Palm Island Project, Palm Island will be built on land reclaimed from the sea resembling the shape of a Date Palm Tree that will be visible from the moon, in the latest addition to Dubai’s Architec- tural and Engineering Services for Master Plan of Date Palm Island Project, Palm Island will be built on land reclaimed from the sea resembling the shape of a Date Palm Tree that will be visible from the moon, in the latest addition to Dubai’s architectural landmarks.
It will include 2,000 villas, up to 40 luxury hotels, shopping complexes, sport facilities, cinemas and the Middle East’s first marine park. The Island will be built in the shape of 17 huge fronds surrounded by 12 kilometers (7.5 miles) of protective barrier reefs, extending five kilometers (three miles) into the sea south of Dubai city and adding 120 kilometers (75 miles) of sandy beaches. They will be accessible by 300 metre (990-feet) bridges from the mainland or boat to two marinas, while the main causeway will also have a monorail system.
K. Brief description of services:
SEATEC by Dynamic Engineering Consultants Co., Ltd. and InterDesign Co., Ltd. provided consulting services in preparing of Conceptual Land Master Plan for trunk area shall encompass a natural aquarium, sport facilities, marina, a themed shopping / commercial area and residential blocks. The scope of services rendered by SEATEC
Group shall be divided into three parts:
- Preparing the Conceptual Land Use Master Plan for trunk area
- Preparing an illustrated aerial view,
- Preparing a scaled model of the proposed scheme.