Athletes Village and International Zone for 13th Asian Games

Project name : Athletes Village and International Zone for 13th Asian Games

Construction Supervision Consultant : S.D.C. Company Limited (SDC)

Name of Associated Firm : 

  • Engineering System Consultants Co., Ltd.
  • Engineering Plus Co., Ltd.
  • Light Green Service Co., Ltd.

SDC was in charge mainly on construction supervision of structural works especially prefabricated design and installation techniques and architectural works.

Location : Rangsit Campus, Thammasat University, Pathumthani, Thailand

Name of Owner : Ministry of Finance Rama 6 Rd., Sam Saen Nai, Phyathai Bangkok 10400 Tel. 0-2271-3132 Fax. 0-2271-3132

Financing agency/institution : Budget of Thai Government

Value of project : 2,700 Million Baht

Value of consortium’s contract : 43.2 Million Baht. (S.D.C.’s Sharing Value of the Contract : 9.54 MillionBaht)

Original and actual dates of commencement & completion : July 1996 – January 1999

Brief description of the project : The project comprised 23 blocks of 8-storeyed building, total area of 260,000 sq.m., for athletes village and a 2- storeyed building with total area of 3,000 sq.m. for international zone including utilities and landscape.

1 16

Brief description of services : The consultant is responsible for construction supervision of architectural work, structural work, mechanical system, electrical and data communication system, security system, broadcasting system and sanitary system. The construction of 4,900 unit, athletes village can be said to offer an alternative for the construction of large scale housing projects.

2 9 3 10

 

The construction was completed within a period of 2 years, a very short time for a project which comprises twenty three 8 to 14 – storeyed buildings and covers a construction area of 260,000 sq.m. What differentiates the athletes village from other housing projects is the application of the ‘Prefabrication System’. Most components of the buildings e.g. slabs stairways, walls etc. are pre-cast components. It is a most successful project in respect of schedules, budget and quality, to be accomplished with a most limited period of time and under strictly controlled budget.