Construction Supervision for the Sattahip-Map Ta Phut Railway Project

Project Name: Construction Supervision for the Sattahip-Map Ta Phut Railway Project.

Name of Company: Thai Professional Engineering Consultants Co., Ltd.(TPEC)

Name of Associated Firms: Pacific Consultants International (PCI) , Japan.

Location: Provinces of Chonburi and Rayong in the Eastern Seaboard area, Thailand.

Client: The State Railway of Thailand(SRT), Ministry of Transport and Communications.

Project cost: 1,519 Million Baht.

Duration: 03/10/2534-30/11/2537

Type of services: The Consultants’s services consisted of three(3) parts;

(1) Part I Prequalification of Contractors, the Consultant assisted the SRT in prequalifying the Contractors by evaluated the submitted prequalification documents of the contractors immediately after receiving the documents from the SRT and submitted the Evaluation Report to the SRT within two (2) weeks after receiving the documents.

(2) Part II Tender Evaluation, the Consultant assisted the SRT in conducting the project briefings, site orientation and replying to the tenders’ questions during tender preparation period. After tenders were received from the invited tenderers, the consultant assisted the SRT in checking and evaluating the received tender documents.

(3) Part III Construction Supervision, the Consultant supervised the construction works on behalf of the SRT for the total construction period and other necessary periodic services, such as preparation of “As-Built Drawings” and Maintenance Completion Report etc., in the following Maintenance Period.

Project description : The project started from the Sattahip, Chonburi Province, to Map Ta Phut, Rayong Province, along the eastern shore of the Gulf of Thailand, south of Bangkok. The Construction work started from the junction at Kao Shee Chan Station 179+000 on the Chachengsao – Sattahip Railway Line to the Map Ta Phut Industrial Complex and Port area (Km. 203 + 070.000)

The main works of the project are ;

(1) General Items and Temporary Works, comprised of project Management and control, provision and maintenance of temporary facilities and equipment, insurance, project Schedule and control, testing, survey, various submittals and in mobilization and demobilization etc.

(2) Earth Work, comprised of clearing and grubbing, excavation, embankment, subbase and slope protection.

(3) Road and Yard Pavement, comprised of aggregate base course, asphaltic pavement and double bitumen surface treatment for public road and station area and traffic control facilities.

(4) Structures, comprised of 15 bridges, 20 box culverts  and concrete  retaining walls including protection of existing gas pipe line.

(5) Buildings, comprised of Row Houses, single houses, Major and Minor Station Buildings, Platform, Fence and ROW walling.

(6) Pipe work, comprised of RC. Pipe culverts, sewerage system for station buildings and concrete formation drains.

(7) Utilities, comprised of electrical work including power supply for signaling and telecommunication system, and fresh water supply system for Khao Shee Chan Station, Banchang Station and Map Ta Phut Station.

(8) Track Laying, comprised of placing ballast, sleeper, fastening and laying rail including lifting, leveling, lining tamping for Track, Turnout and Level Crossing. The work included the supply of track maintenance equipment.

(9) Signaling and Telecommunications, the work comprised of installation of signal aspects and cabling for signaling and telecommunication system including testing and commissioning.

301 Moved Permanently

301 Moved Permanently


nginx