Project Name: Construction Supervision of Suvarnabhumi Airport Rail Link and City Air Terminal
Name of Company: Thai Engineering Consultants Company Limited
Name of Associated Firms:
- Asian Engineering Consultants Corporation Limited
- Pacific Consultants International
- Design Concept Co., Ltd.
- Wisit Engineering Consultants Co., Ltd.
- Pacific Consultants International (Thailand) Co., Ltd.
Location : Bangkok to Samut Prakarn, Thailand
Client: State Railway of Thailand (SRT), Ministry of Transport
Project Cost: 26,000 Million Baht
Type of Service: Contract Management and Supervision of Construction Works including Testing and Commissioning
Project Description: The Rail Network Link to Suvarnabhumi Airport (Phayathai Makkasan/Asoke-Suvarnabhumi Section) or other known as Suvarnabhumi Airport Rail Link and City Air Terminal Project
consists of 2 commuter lines as follows:
(1) Suvarnabhumi Airport Express (SA Express) : non-stop commuter train from the City Air Terminal (CAT) to Suvarnabhumi Airport and vice-versa with traveling time not more than 15 minutes
(2) Suvarnabhumi Airport City Line (SA City Line) : commuter train from Phayathai Station linking with the BTS skytrain and the Suvarnabhumi Airport Station with other 6 stations. i.e., Rachaparob, Makkasan/Asoke at CAT, Ramkamhaeng, Huamark, Tabchang, and Ladkrabang.
The main components of the project are:
- Elevated rail structures from Phayathai Station to Ladkrabang Station, total distance of 26.8 km.
- At-grade rail structures from Ladkrabang Station approaching the ramp towards the underground structure to Suvarnbhumi Station, total distance of 860 meters
- Ramp and underground rail structure to Suvarnabhumi Station, total distance of 914 meters
- Depot located at Klongton
- City Air Terminal to facilitate check-ins for outbound/ departing passengers
- 7 Stations and the Suvarnabhumi Station at the basement of the Airport Terminal Building.