Project Name: Elevated Toll Road Northern Extension Project
Name of Company: Siam General Engineering Consultants Co., Ltd.
Name of Associated Firm: -
Location: Bangkok, Thailand
Name of Client: Department of Highways (DOH) and Don Muang Tollways Co.,Ltd.
Project Cost: 13 Million Bath
Project Description: The elevated toll road, 7 kilometers long northern extension, is on Highway Route No.31 (Vipavadee Rangsit Road) connecting Chaeng Wattana Intersection and Anusornsatan Veerachon. The alignment of elevated road is located along the center line of the Vipavadee Rangsit Road and is 14 meters high above the existing road surface. The elevated road is concrete structure having 6 lanes for future traffic plus toll collection system, entrance/exit ramps and traffic control facilities.