Pre-Clinic Operations and Medical Informatics Building Faculty of Medicine Siriraj Hospital

Project Name: Pre-Clinic Operations and Medical Informatics Building Faculty of Medicine Siriraj Hospital

Consultants: Plan Consultants Co., Ltd.

Project Owner: Faculty of Medicine Siriraj Hospital

Location: Faculty of Medicine Siriraj Hospital, Bangkok Noi Campus, Thailand

Project Area: 64,729 m2

Building Height: 72 m

Number of Stories: 15

Building Designer:

  • Architect - SJA 3D Co.,Ltd.
  • Civil Engineer (Structure) – Ceda Co.,Ltd.
  • Electrical Engineer – W. and Associates Design Co.,Ltd.
  • Mechanical Engineer – W. and Associates Design Co.,Ltd.
  • Sanitary Engineer – W. and Associates Design Co.,Ltd.
  • Landscape Architect – Exit Landscape Co.,Ltd.

Contractor: Westcon Co.,Ltd.

Type of Building: Reinforce Concrete

Construction Cost: 888,000,000 Baht

15 16

 

Profile of Project:

Pre-Clinic Operations and Medical Informatics Building will be the newest building in Faculty of Medicine Siriraj Hospital, Bangkok Noi Campus. The concept design proposes two auditorium, cafeteria, offices, classroom, information centre and offers spectacular views of the Chao Phraya River. Pre-Clinic Operations and Medical Informatics Building that provides the appropriate levels of flexibility, privacy, access to light, technological capabilities and cost savings.

The two auditorium(1st-4th floor) that used transfer beams for wide-span structures while support loads from multi-story since 5th-15th floor. The information centre in 7th floor will be Medical Informatics centre of Faculty of Medicine Siriraj Hospital, Bangkok Noi Campus that provided building automation system such as fire alarm, fire protection, cctv, access control, etc. which the modrenest in south-east asia.

According to Pre-Clinic Operations and Medical Informatics Building is apart of school of study in term of Medicine which high hygienic also water supply in part of Medicine technic use RO.(reverse osmosis) system for hygienic of equipments and health.

Outstanding of Project:

  1. Existing Building Protection during construct the Basement
  2. Demolishing the in-site Building
  3. Traffic control
  4. Safety & Environment control

17

301 Moved Permanently

301 Moved Permanently


nginx