Solid Waste Collection System for Suvarnabhumi Airport

Project Name: Solid Waste Collection System for Suvarnabhumi Airport

Firm Name: TEAM Consulting Engineering and Management Co., Ltd.

Associate Firm: ASDECON Corporation Co., Ltd.

Location: Samut Prakan Province, Thailand

Project Owner: New Bangkok International Airport Co., Ltd.

Type of Project: Sanitation system

Value of Contract: 3.50 Million Baht

Period: December 2001 – October 2002

Project Features: Suvarnabhumi Airport locates in Nong Ngu Hao area of Samut Prakan Province approximately 30 kilometers south east of Bangkok, on a land of 8 x 4 sq.km. With the Passenger Terminal Building utilization area of 550,000 sq.m., the airport’s capacity is 30 million passengers perannum.

Suvarnabhumi Airport infrastructure system includes utilities, roadways, information system, fuel tank farm, airport lighting, solid waste system, wastewater treatment system, etc.

The Consultant undertakes the data collection, topographic survey, design, construction cost estimate, and preparation of tender document services of the following components:

  • Solid waste collection points in the Passenger Terminal Complex, Cargo Terminals, Aircraft Maintenance Facilities, Airport Maintenance Facilities, GSE Maintenance Areas, Catering Facilities, and Waste Water Treatment Plant, which also includes the infected waste and aircraft waste.
  • Collection and Compaction Center Building, including machinery for compaction of waste materials, and provisions for maintaining equipment and washing of vehicles.
  • Weed removal points at the two Pumping Stations.
20 21 22

 

301 Moved Permanently

301 Moved Permanently


nginx