Survey & Design of Highway No. 4 Patthalung - Trang

Project Name Survey & Design of Highway No. 4 Patthalung - Trang

ConsultantConsultants of Technology Co., Ltd. (COT) and PVS-95 Consultants Co.,Ltd.

Location Patthalung and Trang Provinces, Southern Thailand

Owner Department of Highway (DOH), Ministry of Transport

Description Study on alternatives of widening 2-lane highway into 4-lane, approximately 12 km. of  highway No.4. between km. 36+400 to km. 49+200. The highway traverses through a virgin reserved forest area in Trang province. Most likely the widened road would initiate growth in tourism and benefit economy.

Construction Cost 430 Million Baht (10.24 Million $US) (1 $US : 42 Baht)

COT Engagement

1. Economic studies

2. Environmental impact assessment

3. Engineering design

Duration July 2005 - October 2008

6


https://www.deriheru-navigation.com/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
scatter hitam
depo 5000
scatter hitam
sv388
Buntut77toto | Link Alternatif Login Buntut77 Resmi Menang Besar Terpecaya
Bizz77game: Situs Link Login Alternatif Menang Besar Bizz77 Terpecaya Online
bizz77
https://blogceta.zaragoza.unam.mx/wp-content/id-ID_scatter-hitam/
https://inlislite-lib.unm.ac.id/fiber/
https://ic.upstegal.ac.id/fund/
https://ic.upstegal.ac.id/public/scatter-hitam/
https://pelita.pn-pasarwajo.go.id/