https://news.asosiasi-emiten.or.id/
https://www.deriheru-navigation.com/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
jurnalprodi.idu.ac.id/public/scatterhitam-1
jurnal.insida.ac.id/tools/sv388
scatter hitam
mahjong scatter hitam
sabung ayam
depo 5k
depo 5000
scatterhitam
scatter hitam
scatter hitam
sv388
slot gacor
link scatter hitam
sv388
slot thailand
togel online
scatter hitam
sv388
scatter hitam
The Cascade Run-of-River Hydropower Potential Development Project on Mekong Mainstream

The Cascade Run-of-River Hydropower Potential Development Project on Mekong Mainstream

Project  Name: The  Cascade  Run-of-River  Hydropower  Potential Development Project  on  Mekong Mainstream

Name of Company: Panya Consultants Co., Ltd.

Name of Associated Firm: Maha Nakhon Consultants Co., Ltd. (for Potential Plan Study), Macro Consultants Co., Ltd. (for Pre-Feasibility Study)

Location: Mekong River, Loei and Ubon Ratchathani Provinces, Thailand , Vientiane Capital and Champasack Provinces, Lao PDR

Client: Department of Alternative Energy Development and Efficiency

Project Cost: 554,026 million baht

Type of Service: Potential Plan study, pre-feasibility study and initial environment examination

Project Description: The seven run-of-river hydropower projects on Mekong mainstream resulted from potential study can be summarized as follows:

  1. Khone Falls Hydropower project with installed capacity of 4 x 60 MW
  2. Ban Koum Hydropower Project with installed capacity of 25 x 82 MW
  3. Pak Chom Hydropower Project with installed capacity of 13 x 114 MW
  4. Luang Prabang Hydropower Project with installed capacity of 10 x 124 MW
  5. Sayaburi Hydropower Project with installed capacity of 11 x 92 MW
  6. Pak Beng Hydropower Project with installed capacity of 9 x 108 MW
  7. Sambor Hydropower Project with installed capacity of 35 x 75 MW

The pre-feasibility study and initial environmental examination of the two following projects are carried out:

1. Pak Chom Hydropower Project The location of the barrage is adjacent to Ban Huai Khop, Hat Khamphi Sub-district, Pak Chom District, Loei Province, Thailand and near Ban Huai Hang, Sangthong District, Vientiane Capital Province, Lao PDR.

  • Spillways are reinforced concrete structures, equipped with 14 radial gates which are 20.00 m wide and 25.50 m high.
  • A powerhouse is located on the left side of the spillway with total installed capacity of 1,079 MW.  It is equipped with 13 bulb turbines and 83 MW each.
  • Navigation locks are located on the right side of the Mekong River.
  • Stream fishway is located on the left bank of the Mekong River.

2. Ban Koum Hydropower Project is near Tha Long Village, Huai Phai Sub-district, Khong Chiam District, Ubon Ratchathani Province, Thailand and Ban Koum Noi, Sanasomboon District, Champasack Province, Lao PDR. The project features can be summarized as follows:

  • Spillways are reinforced concrete structures, equipped with 22 radial gates which are 20.0 m wide and 25.50 m high.
  • A powerhouse is located on the left and right sides of the spillway with total installed capacity of 1,872 MW. It is equipped with 26 bulb turbines and 72 MW each.
  • Navigation locks are located on the right bank of the Mekong River.
  • Stream fishway is located on the left bank of the Mekong River
11 12

 


https://news.asosiasi-emiten.or.id/
https://www.deriheru-navigation.com/
https://blogceta.zaragoza.unam.mx/wp-content/-/buntut77/
https://blogceta.zaragoza.unam.mx/wp-content/app/
jurnalprodi.idu.ac.id/public/scatterhitam-1
jurnal.insida.ac.id/tools/sv388
scatter hitam
mahjong scatter hitam
sabung ayam
depo 5k
depo 5000
scatterhitam
scatter hitam
scatter hitam
sv388
slot gacor
link scatter hitam
sv388
slot thailand
togel online
scatter hitam
sv388
scatter hitam