The Second Bangkok International Airport (Suvarnabhumi Airport)

Name  of  Project : The Second Bangkok International Airport (Suvarnabhumi Airport)

Name of Company : Index Internation Group Co.,Ltd.

Location : Samutprakarn  Province, Thailand

Name  of  Owner : New Bangkok International  Airport Co., Ltd.  (NBIA) 99 Moo 10, Bangna – Trad Hwy., Km. 15,Ratchathewa, Bang Phli, Samut Prakarn 10540 Tel. 02 – 723 – 0000 - 39 Fax. 02 – 723 - 0010

Financing Agency/Institution: New Bangkok International Airport Co., Ltd.

EValue of Project in Thai Baht equivalent (indicate currency and exchange rate used): 120,000 Million Baht (US$ 4,682.01 Million) (US$ 1 = 25.63  Baht)

Value of the firm’s, or joint venture’s or consortium’s contract in Thai Baht equivalent (indicate currency and exchange rate used) : 914  Million Baht  (US$ 35.66 Million) (US$ 1 = 25.63 Baht)

G.Original and actual dates of commencement  and completion  : March 1992 - October1999

Form of firm’s participation: Consortium

Name of other consortium: Netherland Airport Consultants BV.

Louis Berger International Inc.

Asian Engineering Consultants Corp., Ltd.

Design 103 Co., Ltd.

Team Consulting Engineering and Management Co., Ltd.

4 4

Brief  description of  project  (attach photos if available) and the works to which the firm’s services were provided :

The  Second Bangkok International Airport (SBIA)  is located at Nong Ngu Hao area which covers Rajadeva, Nong Prue and Bang Chalong Sub-districts Bang Phli district, Samutprakarn Province.  It occupies a total area of 3200 hectares or 32 sq.km.  There are totally 5 access roads to SBIA.  The boundary line lining with the polder system for flood protection around the whole site area.  The major facilities of the airport are.

- Passenger Terminal  :  covers a total floor area of 500,000 sq.m. to accommodate 30 Million Annual Passenger (MAP) Its capacity upon the completion of future expansion will be 100 MAP.

- Runway – Taxiway System  :  at first phase runway – taxiway system includes two 3,700 metre long runways, rapid exit taxiway on both runways

- Air Traffic Control Complex  :  The Air traffic control tower is 90 meters in height with a total floor area of 1000 sq.m.

- Aircraft Maintenance Facility  :  The aircraft maintenance facility will provide 4 hangars with 2 aircrafts  parking space each.

- Cargo Terminal  :  Cargo terminals include 2 separate complexes with the building area of 190,000 sq.m.

- Fire/Rescue Station  :  There are 3 stations providing fire/rescue services for the airport.

- Catering Facilities  :  Catering facilities will provide a total floor area of  90,000 sq.m. which will provide production capacity of 70,000  meals/day

Brief description of the services provided by the firm, or joint venture or consortium :

- Phase I Provided airport master planning, conceptual and schematic design, environmental studies, program control systems and initial budget.

- Phase II Involves advice on packaging of airport systems, development of terms of reference, assistance in selection of detailed designers, and supervision of detailed design of all project facilities.

- PhaseIII Provides for construction management.  This involves structuring and implementation of construction tendering processes, management and

coordinatio  of all construction work and direction of all contract management.

Tasks involved in the project are as follows :

9

301 Moved Permanently

301 Moved Permanently


nginx