Project Name: The supervision for the construction work of the elevated road (bridge) across the sea (Talay Noi) from Ban Sai-King to Ban Haopa, Puttalung Province to Songkhla Province.
Company Name: Wishakorn Co.,Ltd.
Type of service: Supervision for the construction work.
Project location: Puttalung - Songkhla Province, Thailand.
Owner: Department of Rural Roads (Thailand)
Duration: September, 2004 - August, 2006
Project Cost absolutely (million/Baht): 549,000,000.00
Project Cost (million/Baht) : 12,000,000.00
Company Partner: Wishakorn Co., Ltd.
Ratio of Responsibility: 100%
Project area/Size: The elevated road across Talay Noi for a distance of 5.47 Km. and the road of 14.347 Km. long.
Objective of Project: The supervision for the construction work of the elevated road (bridge) of 5.45 Km. across the sea (Talay Noi) from Ban Sai-king to Ban Haopa, Puttalung province to Songkhla province for the Department of Rural Roads.
Benefit of Project :
1. Make the connection between the Puttalung Songkhla and Nakorn Sri Thamaraj and happen smoothly and fast more. (Short-cut for 80 km.)
2. Resuscitate natural resources and the environment in basin of a river lake Songkhla area give get back to the state has originally that ever fertile too much most.
3. Help enlarge goods market and decrease the capital in the production because of there is good road transportation convenient make expenses in the shipping decreases to lower.
4. Encourage manner ecology tourism.
5. Encourage economic and the social together with, develop a city accident gives the quality of life of people in the area and the area is similar to improve.